seamless-plan-building-blueprint-top-view-vector-architectural-background-backgrounds-1326

TOTAL ELECTRIC PROJECTS

3.JPG

Mills Building

Occupied renovation of a historic office building including adding an additional story and mechanical penthouse. Renovation included; three (3) new services, new and renovated elevators, generator, fire alarm system, lightning protection, DAS and lighting control systems.

Kipp College Prep

Phased construction of a five (5) story high school building with green roof and a new multi-sport athletic field complex.  Construction included; new service, generator, athletic sports lighting, theatre lighting, lighting control system and new fire alarm system.

1.JPG
2.JPG

Hotel Riggs

This project was a full hotel remodel consisting of 220+ units in Washington DC.  Included in this remodel were 220+ units, two basement bars, restaurant, and kitchen.  Construction included new service, historical lighting, extensive lighting controls, and new fire alarm system.

Walmart Dundalk

The Walmart in Dundalk MD was a full Walmart remodel.  This project consisted of an interior remodel with the addition of the deli, refrigeration cases, service upgrade, and market area.  

Walmart Dundalk drone 08 25 2022.jpg