top of page
seamless-plan-building-blueprint-top-view-vector-architectural-background-backgrounds-1326

TOTAL ELECTRIC PROJECTS

3.JPG

Mills Building

Occupied renovation of a historic office building including adding an additional story and mechanical penthouse. Renovation included; three (3) new services, new and renovated elevators, generator, fire alarm system, lightning protection, DAS and lighting control systems.

Kipp College Prep

Phased construction of a five (5) story high school building with green roof and a new multi-sport athletic field complex.  Construction included; new service, generator, athletic sports lighting, theatre lighting, lighting control system and new fire alarm system.

1.JPG
2.JPG

Hotel Riggs

This project was a full hotel remodel consisting of 220+ units in Washington DC.  Included in this remodel were 220+ units, two basement bars, restaurant, and kitchen.  Construction included new service, historical lighting, extensive lighting controls, and new fire alarm system.

Walmart Dundalk

The Walmart in Dundalk MD was a full Walmart remodel.  This project consisted of an interior remodel with the addition of the deli, refrigeration cases, service upgrade, and market area.  

Walmart Dundalk drone 08 25 2022.jpg
bottom of page